I have
organised my schedule in a way which will allow me to work my way through each
section of my production. I have done this by sharing out the time equally between
my three articles and my front cover and contents page. I have chosen to
perfect my first article which I have already created mock ups for first as it
means this is one fifth of my production that I will already be reasonably
satisfied with.
I believe my
schedule is realistic as I have considered other deadlines which I may be faced
such as Extended Project, therefore I have considered other work which will be
taking up my time. Although I have had to fit a lot of work into a short period
of time I believe I will be able to complete it due to my time management
skills.
I have built
contingency time into my schedule towards the end of the time limit as it will
allow me to catch up with any pieces that may need perfecting. This will become
evident when I gain feedback and advice from my peers and assessor throughout
the production stage.
The biggest
challenges that I will face in my schedule will be completing the first draft
of each piece within the time limit I have given myself. This is because I am
unable to work on them at home due to not having access to InDesign or
Photoshop.
This week I have managed to successfully complete my schedule with a realistic time scale which I believe I will be able to follow. I have also gained feedback from my target audience in terms of my flat plans. This has given me both positive and negative feedback which will enable me to create the most appealing and effective product for my target audience.
This week I have managed to successfully complete my schedule with a realistic time scale which I believe I will be able to follow. I have also gained feedback from my target audience in terms of my flat plans. This has given me both positive and negative feedback which will enable me to create the most appealing and effective product for my target audience.